D16A6 un-preparation:

    1. Unbolt valve cover and remove it
    2. Unbolt upper timing belt cover and remove it
    3. Unbolt harmonic damper and remove it (This is better done with an impact gun)
    4. Unbolt lower timing belt cover and remove it
    5. Unbolt motor mount from the block like in the picture below
      1. Unbolt down pipe and remove it
      2. Unbolt exhaust brackets and remove them
      3. Unbolt engine brace and remove it
      4. Unbolt flywheel access cover and remove it
      5. Unbolt water neck from front of head and remove it you’ll need this later so don’t loose it
      6. Unplug back up switch and remove it if you have a hydro back up switch from the S20 transmission (92-92 Hydraulic transmission) if not leave it in there
      7. Unbolt starter and remove it
      8. Unbolt transmission and separate it from engine
      9. Now put the engine back together so you can sell it on EBay or whatever

These steps should take you about 30-40 minutes with regular hand tools and an impact gun.

Preface

Price vs. Parts

Considerations

D16a6 Removal

Engine Bay Prep

D16a6 Unprep

Tranny Prep

D16Z6 Prep

Interior/ECU Prep

Wiring Concerns

D16Z6 Engine Wiring

D16Z6 ECU Wiring

Motor Installation

Wiring Walk Thru

Wiring Walk Thru Pg 2

Thezcresource.com
All contents of this website are property of TheZCResource.com, except where noted otherwise, and are subject to US Copyright laws